| Home | Rigging Page -1 | Rigging Page -2 | Rigging Page -3 |
 .
    Over Head Rigging for pick from trailer.
 
    Unloading 226,000 lb. GE Transformer from trailer in preparation of rolling over to concrete pad.
 
.
NEXT PAGE
.| Goldhofer Trailer | Schnobel Trailer | Double lane configuration |
| Barge loading / unloading | Suspension Beam Trailer |
| HOME |